TABLE OF CONTENTS
7. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General Layout
Figure 2 Air and Noise Monitoring Locations
LIST OF APPENDICES
Appendix A |
|
Appendix B |
|
Appendix C |
|
Appendix D |
|
Appendix E |
|
Appendix F |
|
Appendix G |
|
Appendix H |
|
Appendix I |
|
Appendix J |
|
Appendix K |
Weather and Meteorological Conditions during Reporting Month |
Appendix L |
|
Appendix M |
|
Appendix N |
i. The Civil Engineering and Development Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to undertake the Environmental Team services for the Project and implement the EM&A works.
ii. This Monthly EM&A report presents the environmental monitoring and audit works for the period between 1 February 2017 and 28 February 2017. As informed by the Contractor, major activities in the reporting month were:
Temporary utility diversion;
Implementation of Temporary Traffic Arragement (TTA);
Construction of Tunnel structure;
Construction of Subway B;
Construction of guide walls and D-walls; and
Construction of District Cooling System Works.
Breaches of the Action and Limit Levels
iii. No Action / Limit Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a, KTD2a and KER1b in the reporting month.
Complaint, Notification of Summons and Successful Prosecution
iv. A complaint received on 9 February 2017 was referred from EPD on 21 February 2017 and summarized as below:
No car washing machine was found in the construction site near the gate of former Radar Tower (hereinafter referred to as “the Site”).
Dust was observed when the vehicle leaving and entering the Site.
The notification of complaint was received by ET on 22 February 2017.
Reporting Changes
v. There was no reporting change in the reporting month.
Future Key Issues
vi. The key issues to be considered in the coming reporting month include:
Potential environmental impacts arising from the above construction activities are mainly associated with construction dust, construction noise, water quality, waste management and landscape and visual impact.